![]() ![]() A big lamp and a small lamp in the two massive motion control systems downstairs. Sitting around days earlier planning test shoots with the team from Mark Roberts Motion control, someone had joked we had a big and a small rig like Luxo Jr. Tomas T Jernberg has not slept in what seems like days, ever since in a pre-production meeting earlier in the week and an idea appeared we could not kill. ![]() It is cold, it is dark and we are out of time. It’s 5am we have been shooting all week, it is down to just three of us now, all the rest of the crew having done their jobs have left for the night, Patrik Forsberg (Director and head of Stiller) walks the tracks one last time, given the time and when the Bolt rig will be shipped out to London, this is our last take. Last year fxguide was proud to spend a week with Stiller Studios shooting.
0 Comments
Leave a Reply. |